Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.

I don’t know why, but I’ve never thought of the transport logistics involved in building a semiconductor fabrication plant.

  • 0110010001100010@lemmy.world
    link
    fedilink
    English
    arrow-up
    39
    ·
    7 months ago

    Yep, the fab plant is a little east of Columbus (just south of where I live actually). This is one of like 2 dozen “super loads” that has to make its way from the Ohio River up to the plant. I swear there is a website somewhere that keeps track of when the are coming, the routes they take, and the closures involved but my Google-fu is failing me now.